Skip to main content

Update Contractor

PATCH 

/api/manufacturing/contractors/:supplier

Update a contractor's manufacturing settings. Auth: requires Bearer token. Path param: supplier = supplier id. Body: default_outsourced_cost_basis (optional, string, one of: toll, hybrid) - default cost basis applied to new outsourced manufacturing orders for this contractor. Use toll when you own all component materials and the contractor only charges for processing (the contractor's product charge is treated as a processing cost, not added on top of your component costs). Use hybrid when the contractor supplies materials of their own beyond the components you provide (their charge is capitalized into the output cost). Omit or null to fall back to hybrid. Send null to clear the setting (new outsourced orders then fall back to hybrid). Changing the default does not alter existing manufacturing orders; each order may also set its own outsourced_cost_basis override at creation.

Request

Responses

OK

Response Headers
    Content-Type