Skip to main content

Resync Calendar Connection

POST 

/api/calendar/connections/:connection/resync

Start a full resync of the connection in the background: queued changes are replayed, every planned activity in the sync window (30 days back to 180 days ahead) is written to the CRM calendar, and the calendar is read in full. Returns the ID of the background job, whose progress can be read from the tracked job log endpoints.

Required scope: integrations:write

Grant this scope to your token under Settings → Developer → Personal Access Tokens.

Returns 409 when the connection must be reconnected first, and 404 when it does not belong to the authenticated user.

Authentication: Requires Bearer token.

Request​

Responses​

OK

Response Headers
    Content-Type